MINING PLAN EXHIBIT D(CONT) <br /> In stage 1 the mining setback will be 10 feet inside the slurry <br /> wall on east and north sides . Along the west side it will be a <br /> minimum of 200 feet from the Thornton slurry wall/dam structure <br /> and on the south side it will be 42 feet from the permit line or <br /> 10 feet inside the slurry wall . In Stage 2 along the north and <br /> south the setback will be a minimum of 25 feet and on the East <br /> side it will be 50 feet from the permit lines . On the west side <br /> it will be 10 feet inside the slurry wall . The plan for mining <br /> along the perimeter by leaving an adequate setback adjacent to <br /> any structures so if needed a graded 3h to lv slope could be <br /> built if needed that eliminates any chance that these structures <br /> will be affected by mining. This means leaving some gravel but <br /> will insure the integrity of the banks until filling is complete. <br /> MAP EXHIBIT C AND EXHIBITS contain information on all structures within <br /> 200 feet of the mined area. <br /> Site preparation will begin in Stage 1 on the southwestern part <br /> of the permit area. Once the area has been cleaned of trees, <br /> buildings and other rubbish, a slurry wall will be constructed <br /> around the area to be mined. This will serve to block ground <br /> water from entering the mining area to reduce the exposure of <br /> ground water and allow the area to be mined and backfilled as a <br /> dry site. The estimated length of the Stage 1 slurry wall will be <br /> 2270 feet and when keyed into bedrock will average 28 feet deep. <br /> The mining face will be worked at a near vertical slope (%: 1) as <br /> mining progresses thru the area. No mining will take place <br /> within 200 feet of the Thornton Reservoir complex slurry wall/da- <br /> m. This setback is shown on Map Exhibits; C-1, F, and Figures E- <br /> 1, E-2 and E-3 . Please see the attached Geotechnical data <br /> prepared by Deere and Ault Consultants for the analysis of the <br /> mining setbacks around the mine. Along the south side of Stage 1 <br /> the mining setback will be 42 feet . This allows for a safety <br /> factor of 1 . 3 to protect structure along the mine perimeter. <br /> A Plant Site/Stockpile area will be graded on the east side of <br /> the existing lake and the access roads will be improved to <br /> facilitate hauling from the site. Once these areas are completed <br /> mining will begin on the west side of Stage 1 and all material <br /> will be hauled to the Plant Site or stockpiled on the west end of <br /> Stage 2 above the Plant Site until it can be processed. This <br /> 8(Revised 12/15/2014) <br />