allow passage and to minimize disturbance of the hydrologic balance. Light -use roads will utilize <br />culverts designed to safely pass the 10 -year, 24 -hour precipitation event. Ditches and drainage <br />control will be established during construction and maintenance of the roads to minimize erosion <br />and to assist traffic passage. <br />Design and Construction Light -use roads will be field engineered to follow the existing <br />topography as much as practicable. Topsoil will be removed and stockpiled in accordance with <br />WFC's topsoil salvage plan. The horizontal and vertical alignment will be dictated by the <br />topography and the need to avoid obstructions. Light -use road surfacing material will be <br />adequate for the use of the road. Acid or toxic - forming substances will not be used in the road <br />surfacing. Light -use roads will be maintained to minimize erosion and to allow passage of traffic. <br />List of Light Use Roads <br />1. Pond NH 1 -001 Maintenance Road <br />a. This road is roughly 2,300 feet long, stretching from the south side of AA Road <br />southward along the west side of WFC owned property to Pond NH 1 -001. The <br />road will be maintained at a width of 12 feet wide. The road will be gravel <br />surfaced and used to access Pond NH 1 -001 and a surface water line running along <br />the road. A pre -mine roadway exists along this path, so no further excavation will <br />be needed, only graveling. Since there is no additional excavation, no new surface <br />water controls are needed. <br />County Roads <br />Mining and reclamation activities will be conducted within 100 feet of the outside right -of -way <br />of current public roads. However, when blasting or any other mining activities which could <br />create a potential safety hazard are occurring, public access will be prevented and traffic will <br />bypass the specific work area while such activity is being conducted. These activities will be <br />sequenced in a manner to allow public travel through the area on other public roads in the <br />immediate vicinity. <br />Section 2.05.3(3) Page 10 October 2013 (TR -05) <br />E: \New Horizon \DRMS \NHN Permit \04_Techmcal Revisions TR \TR -05 \Documents from Jason \2.05.3(3) Mine Facilities TR- 05.docx <br />