My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-11_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-12-11_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:57 PM
Creation date
12/16/2014 10:04:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/11/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.3 <br />During the construction of the parking area for the office and the nearby slide <br />repair, performed late 1998, approximately 4,200 cubic yards were salvaged. <br />Additionally, an estimated 20,100 cubic yards was salvaged from the <br />disturbance associated with the downhill conveyor project. After the downhill <br />conveyor project was complete, the following topsoil is projected to be <br />available for reclamation. <br />During the construction of the B -Seam portals and the preparation plant <br />approximately 43,000 cubic yards were salvaged. The available topsoil for <br />reclamation is as follows: <br />Pile A (CY) <br />Pile D <br />Piles A - C <br />Parking <br />Slide <br />Conveyor <br />B -Seam & <br />Prep Plant <br />Total <br />Quantity (CY) <br />87,600 <br />4,200 <br />20,100 <br />43,000 <br />154,900 <br />The 5,300 cubic yards of topsoil salvaged during the construction of Pond C <br />and the gob pile is stored in topsoil stockpiles D and E. An addition 800 <br />cubic yards of topsoil was added to topsoil stockpile E during the expansion <br />of the coverfill pile during 2003. <br />A total of 56,800 cubic yards of topsoil was stripped and stockpiled during the <br />construction of the unit train loadout. This quantity results in an average 1.1 <br />foot replacement depth within the disturbed area at the loadout including the <br />disturbance associated with Ponds J & K. The topsoil is stored in topsoil <br />stockpile F. Construction of Gob Pile No. 3 will result in approximately <br />70,000 CY of topsoil that will be stored in Topsoil Stockpile F -1. <br />The design of the gob pile in 2003 was a 10 -year design. At the time of <br />this writing, in May 2006, the gob pile is nearly full and ready to be <br />reclaimed. To reclaim the entire gob pile, approximately 1.0 feet of topsoil <br />will be placed on the completed construction fa_ ce. In total, the operator <br />salvaged approximately 50,000 CY of topsoil. Material from the stockpile, <br />new borrow area and the topsoil stockpile will be utilized for reclamation. <br />. PR -12 2.05-52- 2/10 <br />A P /ROV6,D <br />11 � /6 /jo <br />Pile D <br />Pile E <br />Grand Total <br />Quantity (CY) <br />4,500 <br />1,600 <br />161,000 <br />A total of 56,800 cubic yards of topsoil was stripped and stockpiled during the <br />construction of the unit train loadout. This quantity results in an average 1.1 <br />foot replacement depth within the disturbed area at the loadout including the <br />disturbance associated with Ponds J & K. The topsoil is stored in topsoil <br />stockpile F. Construction of Gob Pile No. 3 will result in approximately <br />70,000 CY of topsoil that will be stored in Topsoil Stockpile F -1. <br />The design of the gob pile in 2003 was a 10 -year design. At the time of <br />this writing, in May 2006, the gob pile is nearly full and ready to be <br />reclaimed. To reclaim the entire gob pile, approximately 1.0 feet of topsoil <br />will be placed on the completed construction fa_ ce. In total, the operator <br />salvaged approximately 50,000 CY of topsoil. Material from the stockpile, <br />new borrow area and the topsoil stockpile will be utilized for reclamation. <br />. PR -12 2.05-52- 2/10 <br />A P /ROV6,D <br />11 � /6 /jo <br />