Laserfiche WebLink
2.05.3 <br />Reclamation of this haul road will involve returning the road to its pre- mining <br />contours. The road will be returned to its relative flat configuration as shown <br />on Map 18 Post Mining Topography. The material from the wash plant <br />excavation that was used to construct this road segment will be returned to <br />the wash plant site to bring the site back to approximate original contours. <br />3) Haul Road for gob pile access. <br />A discussion of the haul road for the gob pile access is presented in Volume <br />IV, Coal Mine Waste Bank Final Design for the Bowie No. 2 Mine, prepared <br />by WESTEC. <br />4) Haul Road to B -Seam Portals <br />General Requirements <br />This road segment is approximately 400 feet long. Reference Map 16, Haul <br />Road Plan & Profile - Gob Pile. This road provides access to the B -Seam <br />portals. Drainage from this road is contained in sediment ponds. <br />• Dust control on this road segment includes gravel surfacing and watering to <br />maintain surface moisture. <br />The truck traffic which will utilize this haul road segment will be 10 and 18 <br />wheel haul trucks. A 30 -foot wide road surface should be adequate for these <br />haul trucks. Vehicle traffic should have no problem with this road <br />configuration. The maximum pitch grade form this road is 10 %. <br />Design and Construction <br />For the construction of this road segment, all vegetation material and topsoil <br />will be removed from the design road bed, shoulders, and surfaces where <br />associated structures will be placed. Topsoil will be placed in one of the <br />topsoil stockpiles located on site. No vegetation material or topsoil will be <br />placed beneath or in any haul road embankment. <br />The embankment specification presented above applies to this road <br />segment. <br />0 PR -12 2.05-30- 02/10 <br />/� PP2ovbD <br />rr �ls%lo <br />