My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-11_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-12-11_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:57 PM
Creation date
12/16/2014 10:04:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
12/11/2014
Doc Name
Pages 2.05-1 to 2.05-83
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Coal Preparation Plant <br />The preparation plant is a structural steel building where coal and rock are <br />separated with heavy media circuits. The wash plant is a closed system, no water is <br />discharged. The structure is approximately 55 feet by 70 feet by 80 feet high. An <br />adjacent motor control center room is approximately 10 feet by 12 feet by 12 feet <br />high. An adjacent synfuel plant is approximately 35 feet by 10 feet by 25 feet high <br />and will be housed in a metal building. The synfuel plant has been removed. The <br />metal building remains in place. <br />Truck mounted filter press <br />A truck mounted filter press will remove the solids from the thickener underflow and <br />return the water back to the thickener. An 8'x 8'x 40' truck mounted filter press will <br />be brought on site and set up adjacent to the preparation plant. The filter press will <br />remain on the truck, no permanent foundation will be established. <br />Thickener <br />The thickener is a concrete structure where water is cleaned and returned to the <br />wash plant. The tank is approximately 70 feet in diameter and 10 feet high. The <br />reinforced concrete walls and floor are approximately 10 inches thick. <br />Refuse Bin <br />The refuse bin will be utilized to hold surges in refuse production from the wash <br />plant and will load refuse haul trucks. The refuse bin is constructed of structural <br />steel and is approximately 20 feet by 20 feet by 60 feet high. <br />Transfer Buildings <br />Two transfer buildings are associated with the wash plant. One transfers the plant <br />feed and the other transfers clean coal. Both are constructed of structural steel and <br />are 16 feet by 16 feet in plan view. The plant feed transfer building is 32 feet high. <br />The clean coal transfer building is 16 feet high. <br />Loadout Transfer Building <br />The loadout transfer building is a structural steel building where the reclaim belt <br />terminates. The coal transfers to the loadout conveyor. The dimensions of the <br />building are approximately 20 feet by 20 feet by 45 feet high. <br />Loadout Structure - Batch Weigh System <br />The loadout structure is a structural steel building where the loadout conveyor <br />terminates. The coal is batch weighed and loaded into rail cars at this location. The <br />dimensions of the building are approximately 30 feet by 40 feet by 120 feet high. <br />MR -154 2.05-19- 06/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.