Laserfiche WebLink
1 <br />I �♦ <br />24 <br />•N <br />1 �. <br />1 <br />i <br />' 32 <br />I31 \33 <br />I23 <br />30 <br />1 <br />21 <br />I29 <br />1 <br />I18 <br />17 <br />1 <br />I <br />I <br />Permit Boundary <br />Proposed Phase I Bond Release <br />B Pit <br />Spoils Area <br />0 <br />1 <br />2 I <br />1 <br />1 <br />�"J 1 <br />1 <br />1 <br />I <br />/ 8O <br />Phase I Bond Release KE E N ES B U RG MINE 2014 <br />Phase II Bond Release <br />FIGURE 1: BOND RELEASE STATUS <br />Phase III Bond Release Prepared By: Date: 11/19/2014 <br />Topsand Stockpile <br />0 250 500 1,000 Feet Drawn By: RFB <br />5;: Habitat Management Revisions: <br />vniw.ha bi�aManagem•nfinc. mm <br />