Laserfiche WebLink
Mobilization Worksheet Cont'd Task#04A Page 2 of 2 <br /> EOUIPMENT.HAUL DISTANCE and Time <br /> Nearest Major City or Town within project area region: MONTROSE <br /> Total one-way travel distance: 45.00 miles <br /> Average Travel Speed: 35.00 mph <br /> Total Non-Roadable Mob/Demob Cost <br /> `*two round trips with haul rig. $1.203.99 <br /> Total Roadable Mob/Demob Cost** <br /> **one round trip,no haul rig: $498.14 <br /> Transportation Cycle Time: <br /> Non-Roadable Roadable <br /> Equipment Equipment <br /> Haul Time(Hours): 1.29 1.29 <br /> Return Time(Hours): 1.29 1.29 <br /> Loading Time(Hours): 0.50 NA <br /> Unloading Time(Hours): 0.50 NA <br /> Subtotals: 3.57 2.57 <br /> JOB TIME AND COST <br /> Total job time: 7.14 Hours <br /> Total job cost: $1,702 <br /> CIRCES Cost Estimating Software <br />