Laserfiche WebLink
Peter Wayland Page 5 of 7 <br /> Brownwood SWSP <br /> December 11, 2014 <br /> 5. All releases of replacement water must be sufficient to cover all out-of-priority <br /> depletions in time, place, and amount and must be made under the direction and/or the <br /> approval of the water commissioner. The release of replacement water may be <br /> aggregated to maximize beneficial use. The water commissioner and/or the division <br /> engineer shall determine the rate and timing of an aggregated release. <br /> 6. The water attributable to the 0.24 shares of the BTDMC must continue to be <br /> diverted in-priority at the ditch then measured back to the Big Thompson River in <br /> the vicinity of the Brownwood Pit and up-stream of the Hillsborough Ditch. <br /> Adequate measuring devices acceptable to the water commissioner must be <br /> installed. <br /> 7. In the event Loveland plans to use C-BT Project water as a replacement source, <br /> Loveland shall comply with the Interim Rule issued by the Northern District in May <br /> 2005 regarding the use of C-BT Project water in substitute water supply plans. Prior to <br /> the use of the C-BT Project water, Loveland shall notify this office, the division <br /> engineer and the water commissioner of the amount of C-BT Project water dedicated <br /> to this plan and provide a copy of the Northern District's approval letter as required <br /> by paragraph I(g) of the Northern District's May, 2005 Interim Rule. <br /> 8. The replacement water that is the subject of this plan cannot be sold or leased to any <br /> other entity. As a condition of subsequent renewals of this substitute water supply plan, <br /> the replacement water must be appurtenant to this site until a plan for augmentation is <br /> obtained. All replacement water must be concurrent with depletions in quantity, <br /> timing, and locations. <br /> 9. Adequate accounting of depletions and replacements must be provided to the division <br /> engineer in Greeley (DivlAccountin @state.co.us) and the water commissioner <br /> (,eorQe.roark@state.co.us) on a monthly basis. All amounts shall be in acre-feet. All <br /> submitted accounting shall conform to the Administration Protocol "Augmentation <br /> Plan Accounting - Division One, South Platte River" (attached). <br /> In addition, the applicant shall verify that Loveland includes replacement water for <br /> this SWSP in their monthly accounting. It is the Applicants responsibility to ensure <br /> Loveland releases the leased water in the correct time, place, and amount. <br /> 10. The name, mailing address, and phone number of the contact person who will be <br /> responsible for operation and accounting of this plan must be provided on the accounting <br /> forms to the division engineer and water commissioner. <br /> 11. Approval of this SWSP does not relieve the Applicant and/or landowner of the <br /> requirement to obtain a Water Court decree approving a permanent plan for <br /> augmentation or mitigation to ensure the permanent replacement of all depletions, <br /> including long-term evaporation losses and lagged depletions after gravel mining <br /> operations have ceased. Approval of this plan does not imply approval by this office of <br /> any related litigation. <br /> 12. In accordance with the letter dated April 30, 2010 (copy attached) from the Colorado <br /> Division of Reclamation, Mining, and Safety ("DRMS"), all sand and gravel mining <br />