My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-12_PERMIT FILE - C2010089 (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2010089
>
2014-05-12_PERMIT FILE - C2010089 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:54 PM
Creation date
12/11/2014 10:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089A
IBM Index Class Name
PERMIT FILE
Doc Date
5/12/2014
Doc Name
Protection of Hydrologic Balance
Section_Exhibit Name
Section 2.05.6(3)
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Well Permit # <br />Distance, Ft. <br />11801 <br />2754 <br />116113 <br />2530 <br />179418 <br />3970 <br />83553 <br />4365 <br />74597 <br />4098 <br />253099 <br />4350 <br />BBA's work shows that the closest permitted well ( #116113) would be expected to see a <br />drawdown after 20 years of 0.62ft. Much farther away, permitted well ( #83553) would be <br />expected to see a drawdown of 0.53 ft after 20 years of pumping. BBA reports that these levels <br />of drawdowns are insignificant and represent less than 1% of the available drawdown. None of <br />the permitted wells are located within 600 ft. of PW -001 and no waiver of the 600 ft. statutory <br />limit would be necessary from the State Engineer's office. BBA's report is contained in its <br />entirety in Appendix 2.05.6(3) -la. <br />3) Impact of Spoil Material on Groundwater Flow and Recharge. The mine pit floor will <br />remain open only until the coal has been removed. The pit width will be about 110 ft wide as it <br />is at the adjacent New Horizon Mine. At NHN, each pit advance will take about 2 months so the <br />pit floor is only exposed for a few weeks at a time at most. Water levels in the bed rock zones <br />(overburden, coal, and underburden) will decline in response to the pit face advancement to the <br />north. The bedrock strata will be exposed along 3 sides. The pit side walls will be covered in a <br />relatively short period of time by the advancing backfill and reclamation. Irrigation of the areas <br />to the east, north and west of the permit area will continue unabated throughout the mine life and <br />thereafter and' will continue to recharge the bedrock zones in those areas. Monitor hole GW -N8 <br />(see Figure 2.05.6(3) -2a, Appendix 2.05.6(3) -2) experienced a water level decline of about 12.2 <br />ft. in the overburden and coal zone in response to the mining at the old Peabody Nucla Mine. <br />Following backfill and reclamation of the old Peabody highwall (in early 1992), the bedrock <br />zone (OB and Coal) water level at GW -N8 has recovered about 10 ft or 80% of its decline in a <br />period of less than 20 years. This indicates, that following mining the water level in the bedrock <br />zones immediately adjacent to the mined out area that experienced decline will recover. Within <br />the permit area, and south of Meehan Draw (see Map 2.04.7 -1), the structural attitude at NHN <br />(see Map 2.04.7 -2) is such that irrigation and precipitation water percolating through the <br />reclaimed backfill material will drain to the south along the path of least resistance and issue as <br />spring(s) tributary to Tuttle Draw. To the north of Meehan Draw, any water percolating through <br />the backfill could pond against the "low- wall" and eventually saturate the backfill and issue as <br />springs tributary to Meehan Draw just as the irrigation return water now does. The reclamation <br />plan, (area north of Meehan Draw), is dry land pasture with no irrigation. <br />Figure 2.05.6(3) -1 is a generalized north -south cross - section showing the down gradient drainage <br />through the NHN Mine backfill material. The backfill overburden material at NHN Mine will be <br />placed in the mine pit areas using 3 techniques: 1) cast blasting, 2) end dumping of trucks from <br />Section 2.05.6(3) Page 15 November 2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.