Laserfiche WebLink
Ground Water Monitoring Plan <br />The Water Quality Monitoring schedule for the Williams Fork Mines is found in <br />Exhibit 29 of the permit application. There are ten bedrock ground water <br />monitoring wells and six alluvial monitoring wells. Six of the ten bedrock <br />monitoring wells -the No. 5 Mine, TR -4, TR -7A, 81 -01, 259 and the No. 9 Mine <br />Well -are sampled quarterly and annually for the parameters listed shown below. <br />Quarterly: Temperature, Conductivity, pH and Water Level <br />Annually: Temperature, Conductivity, pH, Water Level, Alkalinity, <br />Hardness, Calcium, Magnesium, Sodium, Bicarbonate, Carbonate, <br />Chloride, Sulfate, Arsenic, Cadmium, Lead, Mercury, Selenium, Iron, <br />Manganese, Zinc, Boron, Molybdenum and Nitrate. <br />Water levels in the four remaining bedrock monitoring wells- 83 -01, 83 -02, 83 -03, <br />and 84 -01 -are measured quarterly. <br />Alluvial valley wells AVF -3, AVF -5, and AVF -6 are also monitored for the <br />quarterly and annual parameters listed above for the bedrock monitoring wells. <br />Alluvial Wells YAW -1, YAW -2, and YAW -5 or YAW -6 will be monitored <br />quarterly and annually for the parameters listed below in conjunction with the <br />development of the North Mains if and when this occurs in the future: <br />Quarterly: Temperature, Conductivity, pH and Water Level <br />Annually: Temperature, Conductivity, pH, Water Level, Alkalinity, <br />Hardness, Calcium, Magnesium, Sodium, Bicarbonate, Carbonate, <br />Chloride, Sulfate, Arsenic, Cadmium, Lead, Mercury, Selenium, Iron, <br />Manganese, Zinc, Boron, Molybdenum, Nitrate, Ammonia, Nitrite and <br />Phosphate. <br />While the Williams Fork Mines are in temporary cessation status, the water <br />monitoring schedule found in Appendix D of Exhibit 29 will be in effect. In <br />accordance with the approved plan, Well TR -7A will be monitored annually for <br />water level and field parameters for the well discussed above. The No. 5 Mine <br />Sump will be monitored quarterly for the water level of the sumped water at the <br />well bore location measurements. <br />Surface Water Monitoring Plan <br />Water quality in the Williams Fork River is monitored at an upstream site and a <br />downstream site. Parameter lists are shown below. <br />Monthly: Temperature, Conductivity, pH, Suspended Solids and flow rate. <br />Williams Fork Mines 22 Permit Renewal 06 <br />C- 1981 -044 December 8, 2014 <br />