My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-01_HYDROLOGY - M1986015
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1986015
>
2014-12-01_HYDROLOGY - M1986015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:41 PM
Creation date
12/5/2014 2:48:24 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986015
IBM Index Class Name
HYDROLOGY
Doc Date
12/1/2014
Doc Name
Water Level Data- November 2014
From
BBA Water Consultants
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(Y)I°IY6 0f�- <br />T-PolT-4K <br />STATE OF O'Donnell - DNR, Tyler < tyler.odonnell@state.co.us> <br />COLORADO <br />Water Level Data for Transit Mix Pueblo East Pit Phase 2 Area - November <br />2014 <br />1 message <br />Paul Bruss <pbruss @bbawater.com> Mon, Dec 1, 2014 at 9:54 AM <br />To: "tyler.odonnelI @state.co.us" <tyler.odonnell @state.co.us> <br />Cc: "Andre Laroche (Andre _Laroche @transitmix.com)" <Andre_Laroche @transitmix.com >, "Gary Tuttle <br />(garyjtuttle @gmail.com)" <garyjtuttle @gmail.com >, "Mark Klune (Mark_Klune @transitmix.com)" <br /><Mark_Klune @transitmix.com >, Chris Sanchez <csanchez @bbawater.com> <br />Tyler, <br />As requested in the May 13, 2014 DRMS Inspection Report, attached is updated water level data for the northern <br />Phase 2 area of the Pueblo East Pit, including measurements of nearby residential wells on 25th Lane. Wells <br />that are currently being measured in the area include Transit Mix's monitoring wells MW-4R and MW -105, as <br />wells as residential wells Mraovich, Rael, Winters, Luczak, Cooper, Jackson and Baker. Residential wells are <br />measured when possible. <br />We note that the inspection report also requested water level measurements from Transit Mix wells MW-4, MW- <br />5, MW -6, and MW7. Except for MW-4, these wells have been mined out and well abandonment forms (GWS- <br />09) have been submitted to the DWR. MW-4 is currently inaccessible and cannot be measured at this time. <br />Let me know if you have any questions pertaining to the data. <br />Paul Bruss <br />Water Resource Engineer <br />pbruss @bbawater.com <br />Bishop - Brogden Associates, Inc. <br />333 W. Hampden Ave., Suite 1050 <br />Englewood, CO 80110 <br />phone: 303.806.8952 <br />fax: 303.806.8953 <br />www.bbawater.com <br />APlease consider the environment before printing <br />this e-mail. <br />AkAk <br />BBA <br />�-'" °. — ._ <br />0 <br />water consultants <br />BISHOP- BROGDEN ASSOCIATES, INC. <br />This e -mail transmission is confidential and may contain proprietary information for the express use of the intended recipient. Any use, <br />distribution or copying of this transmission, other than by the intended recipient, is strictly prohibited. If you are not the intended recipient, <br />please notify the sender and delete all copies. Electronic media are susceptible to unauthorized modification, deterioration, and <br />incompatibility. Accordingly, the electronic media version of any work product may not be relied upon. <br />
The URL can be used to link to this page
Your browser does not support the video tag.