Laserfiche WebLink
December 2, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />im <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 13 of 15 <br />Gob Pile 93 East Drying <br />Area cover salvage in <br />foreground <br />at toe drain <br />North and South <br />Coverfill Stockpiles <br />Windrowed refuse <br />material on southeast area <br />of Gob Pile 93, draining <br />to Ditch B <br />