Laserfiche WebLink
1�1 <br />Unloading operations typically occur at the Haulroad B railroad crossing, where equipment access to the tracks is <br />available. Typically, unloading operations occur on the north side of the tracks, TCC will install a push -wall at this site <br />to facilitate the cleanup of coal in those instances where temporary ground storage is required. The push -wall will <br />consist of pre - formed concrete traffic barriers strategically placed to provide a backstop against which equipment can <br />operate to retrieve coal. <br />Additional measures will be implemented at this site to minimize sediment contributions to the adjacent Foidel Creek <br />stream channel. Drainage from the immediate area of the temporary coal storage site will be routed to an existing rock <br />filter as depicted on Map 24, and berms will be maintained at the site to ensure the rock filter is not bypassed. Buffer <br />zone signs will be erected at the site to assure that personnel operating equipment in the area are aware of Foidel Creek. <br />Lastly, excess coal accumulations resulting from unloading operations will be removed in a timely fashion. <br />A second off - loading point will be established at the railroad crossing located just south of the Foidel School House. I- <br />beams will be driven into the ground at this point with boards attached to create an L- shaped push -wall. Pre- formed <br />concrete traffic barriers will be placed in front of this wall to provide a backstop against which equipment can operate <br />to retrieve coal. Approximately 25 yards of compacted fill will be placed on the railroad track side of the I -beam <br />structure to provide a level surface for the off - loading and coal cleanup operations. Bonding modifications to address <br />the removal of this structure are presented in Appendix A, Volume IA. Excess coal accumulations resulting from <br />unloading operations at this site will be removed in a timely fashion. <br />(8) ............ Coal Proppssing_Waste and_Non- Coal_ProcessingWaste <br />A narrative explaining the construction, modification, use, maintenance removal and reclamation of coal <br />processing and non -coal waste removal handling storage transportation and disposal areas and structures in the <br />permit area_in_ accordance_ with_ sections_ 4,_10_and_4:11_including appropriate_maps,_which_meet the_requirements _ of <br />2 10 explarnmgthe location of each_source of wastewaste storage areaand waste drsposal_facllity, <br />TR07 -59 2.05 -89.1 02/27/07 <br />