development will add approximately 2,430 acres; and Interim Phase III development will add approximately 20
<br />acres to the affected area. Areas to be developed in the WMD during the current and subsequent permit terms are
<br />shown on Map 23 Mine Plan. Alignment of development entries may be adjusted, as necessary, to address geologic
<br />conditions. The preliminary development layout will include main and sub -main development work as described in
<br />the referenced Permit Revisions. The dimension of pillars in these development areas may vary based upon mining
<br />conditions. Sumps and ventilation doglegs will be added as needed. Locations for these minor operational features
<br />are not provided on Map 23, due to the need for some flexibility in the placement of these features.
<br />During the Phase I, II, and Interim III WMD development, preliminary development work will be conducted under
<br />the Fish Creek AVF, Fish Creek, several powerlines, and several stock ponds. A more detailed discussion of
<br />undermining these structures is presented under the subsidence discussion. Because the preliminary development
<br />work (WMD, Panels 13- through 17 -Left)) will be limited to main and sub -main entry development with retention
<br />of support pillars, no subsidence will be associated with these activities.
<br />WOLF CREEK RESERVE (WCR)
<br />WCR Initial Development (Rock -Slope Access and Panels WC -1 through WC -5 Development, TR13 -83)
<br />Initial development of the WCR will not result in any change in surface disturbance, affected area, or the Permit
<br />Area, since all development activities will occur within the boundaries of areas previously affected by development
<br />and mining in the EMD and NMD. Areas to be developed in the WCR during the current permit term are shown on
<br />Map 23, Mine Plan. Alignment of development entries may be adjusted, as necessary, to address geologic
<br />conditions. The preliminary development layout will include the rock -slope access and main and sub -main
<br />development work as described in the referenced Permit Revision. The dimension of pillars in these development
<br />areas may vary based upon mining conditions. Sumps and ventilation doglegs will be added as needed. Locations
<br />for these minor operational features are not provided on Map 23, due to the need for some flexibility in the
<br />placement of these features.
<br />The initial development work will be conducted under the Fish Creek AVF, Fish Creek, several powerlines, and
<br />several stock ponds. A more detailed discussion of undermining these structures is presented under the subsidence
<br />discussion. Because the initial development work will be limited to the rock -slope and main and sub -main entry
<br />development, with retention of support pillars, no subsidence should be associated with these activities.
<br />Underground Drillholes (MR01 -172 — Withdrawn 07/11/01)
<br />2011 -2012 WMD Exploration Program (MR11 -256)
<br />TC proposes to construct drill -pads, and drill and log up to 7 exploration drillholes in the active WMD, in order to
<br />better delineate coal seam thickness and characteristics, and to more accurately define structural conditions,
<br />including faulting. The proposed drillhole locations as shown on Figure EX52 -F1, 2011 -2012 WMD Exploration
<br />Program, and Map 24, are on lands where TC is the surface owner, and the coal is under either fee ( drillholes
<br />TCW001, 002, 004, 005, 006, and 007), or Federal (drillhole TCW003) ownership. The proposed drill -sites have
<br />been evaluated for both potential cultural resource and wildlife impacts, as documented by the cultural resource
<br />survey report included in Exhibit 6L and the wildlife consultation letter provided in Exhibit 23C.
<br />Drill -sites have been selected and located to facilitate access from existing County and ranch roads. Where direct
<br />access from existing roads is not feasible, drilling equipment and supplies will travel overland short distances
<br />during periods when ground conditions are favorable, to access the drill sites. Drill pads will be approximately 75 x
<br />75 feet (0.15 acres), with soil material stripping limited to an area around the drillhole collar, and the area
<br />surrounding any containment pits necessary to support drilling operations, in order to minimize disturbance and
<br />facilitate site reclamation. If required, any containment pits will be excavated to provide sufficient capacity for full
<br />containment of both drilling fluids and materials, and any surface runoff from the pad areas. Drainage from drill -
<br />sites will be controlled by the containment pits, in combination with Alternative Sediment Controls (ASC's),
<br />TR13 -83 2.05 -17.1 12/23/13