Laserfiche WebLink
Loader Worksheet Cont'd Task # 001 Page 2 of 2 <br />Total Travel Time: 0.3904 minutes <br />Total Cycle Time: 0.9554 minutes <br />Load Bucket CaUacit <br />Rated Capacity: 1.50 LCY (heaped) <br />Bucket Fill Factor: 0.675 Blasted rock - <br />Adjusted Capacity: 1.01 LCY <br />Job Condition Correction Factors <br />Site Altitude: 11920 feet <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) <br />Unit cost: $1.798 /LCY <br />blasted (60 - 75 %) 0.675 <br />63.59 LCY /Hour <br />46.97 LCY/Hour <br />46.97 LCY/Hour <br />Total job time: 0.72 Hours <br />Total job cost: $61 <br />URCES Cost Estimating Software <br />Source <br />Altitude Adj: 0.89 <br />(CAT HB) <br />Job Efficiency: 0.83 <br />0 shift/day) <br />Net Correction: 0.74 <br />multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) <br />Unit cost: $1.798 /LCY <br />blasted (60 - 75 %) 0.675 <br />63.59 LCY /Hour <br />46.97 LCY/Hour <br />46.97 LCY/Hour <br />Total job time: 0.72 Hours <br />Total job cost: $61 <br />URCES Cost Estimating Software <br />