COST SUMMARY WORK <br />Task description: Summary of reclamation tasks and costs <br />Permit Action: Routine bond <br />Site: Toltec No 2 update Permit/Job #: M1984039 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 11/2812014 County: San Juan <br />User: WHE <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M039 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />)Flours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Hi hwall reduction from near vertical to 3H: IV <br />LOADER <br />1 <br />1 <br />1 <br />1 <br />0.71 <br />$61.00 <br />$255.00 <br />$1,596.00 <br />$1,003.00 <br />Topsoil replacement, 0.25 acres, 0.5 feet deep <br />LOADER <br />3.01 <br />Revegetate 0.25 acres affected lands <br />REVEGE <br />8.00 <br />Haul reclamation equipment to and from job site 7 <br />MOBILIZE <br />4.00 <br />SUBTOTALS: <br />15.72 <br />$2,915 <br />110 11 !:_R W_ K11�� <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Total = <br />$58.88 <br />Performance bond: <br />1.05% <br />Total = <br />$30.61 <br />Job superintendent: <br />0.00 brs <br />Total = <br />$0.00 <br />Profit: <br />10.00% <br />Total = <br />$291.50 <br />TOTAL O & P = <br />$380.99 <br />CONTRACT AMOUNT (direct + O & P) = <br />$3,295.99 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and/or administration: <br />5.00% <br />$164.80 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $545.79 <br />TOTAL BOND AMOUNT (direct + indirect) = $3,460.79 <br />