Laserfiche WebLink
Loader Worksheet Cont'd Task # 002 Page 2 of 2 <br />Load Bucket Capacity <br />Rated Capacity: <br />Bucket Fill Factor: <br />Adjusted Capacity: <br />Job Condition Correction Factors <br />Site Altitude: 11920 feet <br />Total Travel Time: <br />Total Cycle Time: <br />0.1902 minutes <br />0.7952 minutes <br />1.50 LCY (heaped) <br />0.900 Other - soil, boulders, roots (80 -100 %) 0.900 _ <br />1.35 LCY <br />Source <br />Altitude Adj: 0.89 j (CAT HB) <br />Job Efficiency: 0.83 1 (1 shift/day) <br />Net Correction: 0.74 multiplier <br />Unadjusted Hourly Unit Production: 101.86 LCY/Hour <br />Adjusted Hourly Unit Production: 75.24 LCY/Hour <br />Adjusted Hourly Fleet Production: 75.24 LCY/Hour <br />JOB TIME AND COST <br />Fleet size: 1 Loader(s) Total job time: <br />Unit cost: $1.122 /LCY <br />Total job cost: <br />3.02 Hours <br />$255 <br />CIRCES Cost Estimating Software <br />