My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-12-01_REVISION - C1996083
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-12-01_REVISION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:44 PM
Creation date
12/1/2014 1:22:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
12/1/2014
Doc Name
Letter Application & Public Notice
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR97
Email Name
SLB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />November 25, 2014 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety O <br />esa�e�y G�a02L`O <br />1313 Sherman St., Room 215 r °�R <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #97, Variance request for Gob pile #1 <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a technical revision <br />application to request a variance from Rule 4.10.4(4) for a small section on the western edge of gob <br />pile #1. <br />During a May 21 OSM oversight inspection, it was determined that a portion of gob pile #1 had been <br />constructed at 1.51-1:1V, which is steeper than the approved slope angle of 2HAV. The steep <br />section is along the western edge of the pile, and encompasses 0.1 acres of the 1.1 acre gob pile. <br />The attached stability analyses demonstrates that the gob pile is stable with a small portion of it <br />constructed at a slope angle of 1.51-1:1V. <br />Gob pile #1 is located within the approved disturbed area boundary, and the permit boundary. <br />An increase in the reclamation bond is not required. <br />Please feel free to contact me if you have any questions. <br />Sincerely, <br />Ta uNt,e. 13 i y --, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear, Bowie Resources, LLC (electronically) <br />Paonia Public Library <br />Bureau of Land Management (electronically) <br />US Forest Service (electronically) <br />The following revised permit pages are enclosed: <br />Volume IV - Page 5, 5i <br />Volume XI - Text pages 18 & 19, Stability analyses performed by HBET, dated November 21. <br />
The URL can be used to link to this page
Your browser does not support the video tag.