Laserfiche WebLink
Loeb RE IVES <br />NOV i 4 2014 <br />DIVISiv w - ATION, <br />� G -,FYUMNERALS <br />112c Annual Report <br />0.3 <br />Page 2 of 3 <br />r rt= roc. .... i.,�r <br />Permittee --Name.- <br />aP <br />Jack Clark, Jr. <br />Permit dumber: <br />M-2005-065 <br />Operation Name: <br />Upper Animas Sand and <br />Gravel Pit <br />I County: <br />San Juan <br />Annual Fee Due: 1 $791.00 <br />1 Anniversary Date: <br />December 8. 20 4 <br />Perrot Acreaoe: 16.30 <br />Current Bond Amt: <br />$32,500.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit; an operator stall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing -t-his report; you learn *.hat your site is not -in cornpli$.nee %with the rules and :he <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance u;th Rule 3.1.12(1). <br />?. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES,' please note time limits related to completion of reclamation, Rule 3.1.3. / <br />J <br />YES NO <br />NO <br />'ES NO <br />YES <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted.- a) approval of TEMPORARY CESSATION StaL ? <br />b) approval for INTERIv11TTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />S. Number of acres that were newly affected during the current report year. <br />9. Number of acres tha: were reciauned during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />'1 <br />1 <br />Estimated acres to be reclaimed in the next report year. <br />T -a..a _ �#- - f rA cinrrP nerMitted rnininc, activities began: <br />YES *— <br />YES <br />Z <br />1, <br />A Vaaa au Va Atli <br />Total acres <br />cu wua _ �--, <br />i Total acres <br />- <br />-- - -- - <br />Total acres <br />Total acres <br />backfilled: <br />seeded tivi <br />wltopsoil <br />mulched w-i <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w.% <br />replacement <br />r <br />rate (tonstac): <br />O <br />a vd fertilizer. <br />depth (in.): <br />Q? <br />Seed <br />application <br />Fertilizer <br />application <br />Mulch <br />application <br />`Z &d <br />�%� <br />method: <br />method: <br />method: <br />