My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_REVISION - M1979191 (28)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-11-25_REVISION - M1979191 (28)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:18 PM
Creation date
11/28/2014 11:50:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
11/25/2014
Doc Name
Ex. D- Mining Plan
From
Martin Marietta
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eC 5' '7q <br />4. Exhibit D - Mining Plan <br />Av✓0 / <br />1V L 5 2014 <br />.DivisioN of 4 <br />MIN�NSAND SAFEN �N <br />✓`,�-: I��re I 1 Al W1 7T'4 <br />4.1 Mining Methods <br />There is no change in mining methods from the original Three Bells permit M -1979 -191. <br />4.2 Earthmoving <br />There is no change in earthmoving procedures from the original Three Bells permit M- 1979 -191. <br />Resources on the Veldman property have been depleted. Earthmoving in the Veldman property <br />will consist of reclamation activities. <br />All earth moving due to mining activities will occur on the Ditullio property. Earth moving <br />across the Cache la Poudre River will occur via a conveyor system. The west end of the <br />conveyor bridge is located approximately 20 feet from the southeast comer of Phase 4. The east <br />end of the conveyor bridge is located approximately 20 feet from the southwest corner of Phase <br />3. The approximate location of the conveyor bridge is shown on Figure D -1. <br />All site access to the Ditullio property on the east side of the Cache la Poudre River will occur <br />via the permitted access road on the southern portion of the Three Bells Mine. All site access to <br />the Ditullio property on the west side of the Cache la Poudre River will occur through the Kehn <br />site, located immediately to the west of the Ditullio property. There are no truck or equipment <br />crossings over the Cache la Poudre River. <br />4.3 Water Diversions and Impoundments <br />There is no change in water diversions and impoundments from the original Three Bells <br />reclamation permit M -1979 -191. <br />4.4 Size of Work Areas <br />The size of the largest area in the Ditullio Property to be worked on at one time is Phase 4. The <br />mine limit encompassing Phase 4 is approximately 69.6 acres. <br />The other Ditullio Phase mine limit areas are approximately: <br />• Phase 1: 5.8 acres <br />• Phase 2: 12.5 acres <br />• Phase 3: 16.8 acres <br />• Phase 5: 9.2 acres <br />
The URL can be used to link to this page
Your browser does not support the video tag.