My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-25_REVISION - M1979191 (22)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979191
>
2014-11-25_REVISION - M1979191 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:18 PM
Creation date
11/28/2014 11:50:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979191
IBM Index Class Name
REVISION
Doc Date
11/25/2014
Doc Name
Ex. G- Water Information
From
Martin Marietta
To
DRMS
Type & Sequence
AM1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction of the Developed Water Storage. Five new monitoring wells will be constructed on <br />the Ditullio Property and will be monitored for changes in groundwater levels. The construction <br />of these new monitoring wells will be completed by 3/31/2015. <br />Should MM receive notification of adverse groundwater conditions or a complaint from the <br />well owner, MM will notify the DRMS and propose mitigation measures. Mitigation measures <br />may include the following: <br />Investigation of the notification/complaint to establish parameters and to determine if MM <br />mining operations are the sole cause or contributing to the adverse groundwater <br />conditions. This measure may include the installation of additional monitoring wells at <br />strategic locations to assist in data gathering. <br />If MM mining operations are determined to not be the sole cause, MM will consult with the <br />DRMS on further actions, but will not provide any further mitigation measures. <br />If MM mining operations are determined to be the sole cause of the adverse groundwater <br />conditions, MM will consult with the DRMS on appropriate mitigation measures including <br />(but not limited to) providing temporary or permanent alternative water sources to impacted <br />well owners, repairing or deepening affected wells, installing physical measures such as <br />perimeter drains, well points, low permeability barriers, etc. to assist in mitigation of the <br />adverse groundwater conditions. <br />Other mitigation measures may be developed in consultation with or at the request of the <br />DRMS. <br />
The URL can be used to link to this page
Your browser does not support the video tag.