Laserfiche WebLink
~. .Yi WY <br />. +' .. <br />t <br />t ~. <br />. MR94-38 Bond Estimate ~ _ <br />1) Skid mounted pump -assume 6' x 8' x 3', steel construction =144 cubic feet <br />144 cu.feet x $0.17/cf = $24.48 <br />2) Shed Removal -assume 10' x10' x 8', wood or metal, no foundation = 800 cubic feet <br />800 cu. feet x $0.17/cf = $136.00 <br />3) Waterline Removal -assume 100 feet on each end which includes suction line, remainder to stay <br />buried In place <br />200 feet x $2.09/foot (4" line) _ $418.00 <br />• <br />4)Powerline Removal (wood/cable) <br />13001inear.fee;x $1.72/Foot =. $2,236.00 <br />5) Fence Removal -assume 20' x 20' x 6'h <br />80 linear feet x $0.98/foot = $76.80 <br /> <br />6) Reseeding -assume 6,090 feet x 8 feet =38,540 square feet = 0.8 acres <br />0.8 acres x $300.00/ acre = $240.00 <br />Sub-total $3,131.28 <br />say $3,150.00 <br />25%Adminfee $ 787.50 <br />TOTAL $3,937.50 <br />SAY $4,000.00 <br />, <br />• <br />