Laserfiche WebLink
RR. RECLAIM TIINNEL, BTACICER TIIBE, AND FILL <br />Reclaim Tunnel ~~ ~. ~.~' <br />• ~~ <br />contains `625 c~of concrete ~~~-,' ~_• <br />demolition (~u~inel 270'x 13'x 12') <br />use 12" thick inforced wall O o ~ ~ ~~ <br />270'x 13' = 3 0 sq. ft~,~ 3~~ k .~ <br />2581x 12' = 40 s ft. 3af ~~ ; ~,,r'' <br />ado' , 50 sq. ft. ~,}SU 0- <br />6,750 sq. ft.x $8/sq. ft. _ * $54,000.00 <br />Disposal <br />6,750 sq. ft. x 1' 6,750 cf <br />6,750 cf X 1/2~ = 250 cy <br />250 cy x $2.90/cy = 725.00 <br />i <br />Stacker Tube \`q (~ f ~ ~~ ~ a s `~a- <br />l0 cy of concrete I _ I ~ ~;,<P`~- °~ <br />~~h, 12' diameter, 1' thick) <br />Demo <br />848 sq. ft x $8.0/sq. ft. _ * $6,784.00 <br />Disposa a'nd` <br />'~' --.~31 Cy x $2.90/cy = 89.90 <br />Surge Bin <br />• Demolition * $708.45 <br />Disposal * $a76.9o <br />* cost $8/sq. ft. <br />EARTHWORK <br />Removal of fill & coal stockpile footprint <br />15,703.7 cy <br />Round trip of 4 miles <br />use 5 cy wheel loader and 16 cy dump trailer <br />pg. 317, item 7,200 <br />cost $3.88/cy <br />15,703.7 Cy x $3.88/cy = $60,930.00 <br />Spreading fill on coal processing waste pile <br />use 50' haul 200 hp dozer <br />15,703.7 cy x $.84/cy = $13,191.00 <br />TOTAL = $137,305.25 <br />-24- <br />• Revised 5/23/90 <br />