Laserfiche WebLink
• EARTHWORK <br />Backfilling <br />5,000 cy of soil to be moved <br />50' push, 200 hp <br />5,000 cy x .84/cy = $4,200.00 <br />Revegetation <br />seeding o ar..ea <br />Assume - 3 acre x $641.45/ac = $1,924.35 <br />Total = $77,294.63 <br /> <br /> <br />22 <br />