Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 002 Page 1 of 2 <br />BULLDOZER WORK <br />Task description: Replace Topsoil <br />Permit Action: 2014 SO Cost <br />Site: Ensminger Pit #2 Estimate Permit /Job #: M2010036 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado <br />Date: 11/25/2014 County: Phillips <br />User: ERR <br />Agency or organization name <br />DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M036 -002 <br />Total unit Cost/Hour: $217.14 <br />Total Fleet Cost/Hour: $217.14 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,369 <br />Swell factor: 1.115 <br />Loose volume: 13.791 LCY <br />Source of estimated volume: Application (5" on 18.4 acres) -1 acre for creekbed <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />491.9 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -5% <br />Average site altitude: 4,069 feet <br />Material weight: 2,100 lbs/LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Source <br />0.750 <br />(AVG.) <br />Utilization % <br />Ownership Cost/Hour: <br />$69.05 <br />NA <br />Operating Cost/Hour: <br />$108.22 <br />100 <br />Ripper op. Cost/Hour: <br />$1.86 <br />25 <br />Operator Cost/Hour: <br />$38.01 <br />NA <br />Total unit Cost/Hour: $217.14 <br />Total Fleet Cost/Hour: $217.14 <br />MATERIAL QUANTITIES <br />Initial Volume: 12,369 <br />Swell factor: 1.115 <br />Loose volume: 13.791 LCY <br />Source of estimated volume: Application (5" on 18.4 acres) -1 acre for creekbed <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />491.9 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -5% <br />Average site altitude: 4,069 feet <br />Material weight: 2,100 lbs/LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Source <br />0.750 <br />(AVG.) <br />1.100 <br />CAT HB) <br />1.000 <br />(GEN. <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT/DAY) <br />