My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-24_REVISION - M2010036
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2010036
>
2014-11-24_REVISION - M2010036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:21:09 PM
Creation date
11/26/2014 8:45:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010036
IBM Index Class Name
REVISION
Doc Date
11/24/2014
Doc Name
FW Increase SO02
From
DRMS
To
Rick Ensminger
Type & Sequence
SO2
Email Name
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary of Reclamation Tasks <br />Permit Action: 2014 SO Cost <br />Site: Ensminger Pit #2 Estimate Permit /Job #: M2010036 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 11/25/2014 County: Phillips <br />User: ERR <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M036 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Backfilling and Grading <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />65.72 <br />$17,382.00 <br />$9,103.00 <br />$9,779.00 <br />$2,158.00 <br />Replace Topsoil <br />DOZER <br />41.92 <br />Revegetate the Site <br />REVEGE <br />20.00 <br />Mobilization/Demobilization 7MOBILIZE <br />1 <br />4.11 <br />SUBTOTALS: <br />131.75 <br />$38,422 <br />INDIRECT COSTS <br />101FA 1:7.1W.1OX:\Z117atZe)aIV <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$776.12 <br />1.05% <br />Total = <br />$403.43 <br />0.00 hrs <br />Total = <br />$0.00 <br />10.00% <br />Total = <br />$3,842.20 <br />TOTAL O & P = <br />$5,021.75 <br />CONTRACT AMOUNT (direct + O & P) = <br />$43,443.75 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.25% <br />5.00% <br />Total = 0.00 <br />Total = $1,846.36 <br />$2.172.19 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $9,040.30 <br />TOTAL BOND AMOUNT (direct + indirect) = $47,462.30 <br />TOTAL BOND AMOUNT (rounded) = $47,500.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.