Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 004 Page 2 of 2 <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />YUMA <br />Total one -way travel distance: <br />35.00 miles <br />Average Travel Speed: <br />45.00 mph <br />Total Non - Roadable Mob/Demob Cost <br />$2,157.91 <br />`* two round trips with haul rig: <br />NA <br />Total Roadable Mob/Demob Cost ** <br />$0.00 <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Non - Roadable <br />Equipment <br />Roadable <br />Equipment <br />0.78 <br />0.78 <br />0.78 <br />0.78 <br />0.25 <br />NA <br />0.25 <br />NA <br />2.06 <br />1.56 <br />Total job time: <br />4.11 Hours <br />Total job cost: $2,158 <br />CIRCES Cost Estimating Software <br />