Laserfiche WebLink
State Priority Species <br />• Facility construction and major scheduled maintenance shall not be authorized within big <br />game winter ranges from December 1 through April 15. All unavoidable surface <br />disturbances within the winter ranges during these times would require approval of the <br />USFS or BLM Authorized Officer and consultation with CPW. Monitoring and access to <br />the sites by over -the -snow vehicles shall be permitted, but no snow plowing may occur. <br />• Bear -proof containers would be used and refuse collected frequently to minimize <br />potential for human-bear conflicts at construction sites. Employee training would include <br />information to reduce bear -human conflicts including not feeding bears. <br />Noise reduction mitigation would be utilized on the individual MDW pumps to reduce <br />impacts from their operation. <br />51 <br />