My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-24_PERMIT FILE - M2014043
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014043
>
2014-11-24_PERMIT FILE - M2014043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:35 PM
Creation date
11/25/2014 7:13:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
Permit File
Doc Date
11/24/2014
Doc Name
Second Adequacy Review
From
DRMS
To
Albert Frei & Sons Inc.
Email Name
TOD
PSH
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hatchery Pit Stability Review Memo <br />Page 2 of 2 <br />November 21, 2014 <br />2. Please clarify if the 200 foot offset from the City of Thornton Reservoir slurry wall if from <br />the centerline of the slurry wall, eastern toe of the slurry wall embankment or other <br />reference point. Please update and mining and reclamation plan maps accordingly. <br />3. The Applicant did not specify an offset and mining slope for the north and east side of Phase <br />1. Please provide the proposed Phase 1 north and east side offset and mining slope. <br />4. The Applicant did not specify an offset and mining slope for the west side of Phase 2. <br />Please provide the proposed Phase 2 west side offset and mining slope. <br />5. Please update the Geotechnical Stability Exhibit for the north, east and south sides of the <br />mine to include the proposed slurry wall and anticipated hydrostatic level. <br />6. The Applicant did not provide a typical soil profile description or illustration. Please provide <br />a typical soil profile for the stability analyses. <br />7. Please provide geotechnical borehole data, if available, for the site for Division review. <br />8. Please provide any soil property lab data, if available, for the site for Division review. <br />9. Please provide a geotechnical stability analysis for the Phase 1 excavation being used as a <br />sediment pond during the mining operations in Phase 2. <br />10. Please provide the corresponding slope stability analysis data for the Deere & Ault analysis <br />to allow the Division to duplicate the analysis for verification purposes. <br />11. Please provide the Division with the slope stability monitoring plan to be used during mining <br />and reclamation activities at the site. <br />The Division will verify the Applicant's stability analysis models using Clover Technology's <br />Galena v6.0 slope stability software following the Applicant's response to this letter. <br />If you have any questions, please contact me at (303) 866 -3567 Ext. 8124. <br />Sincer <br />Peter S. Hays <br />Environmental Protection Specialist <br />Cc: Tom Kaldenleach, Division of Reclamation, Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.