Laserfiche WebLink
5.1.4 Final Topsoiling <br />Final topsoiling procedures will be the same as the original permit, M- 1977 -036. <br />5.2 Final Land Use <br />Final land use at the Greeley 35th Avenue Mine West Pit will be Developed Water Resources <br />utilizing a below grade reservoir. <br />Final land use of other portions of the mine will remain consistent with the original reclamation <br />permit, M- 1977 -036. <br />5.3 Reclamation Performance Standards <br />5.3.1 Reclaiming Substituted Land <br />There will be no Substituted Land to be reclaimed, as defined in Section 3.1.2. <br />5.3.2 Time Limit and Phased Reclamation <br />Reclamation of the West Pit is expected to be completed as described in Section 5.1.2. The <br />reclamation plan timeline is within the five year timeframe required in Rule 3.1.3. The schedule <br />indicates slurry wall and reservoir completion within 8 months. Slurry wall construction is <br />anticipated to occur from July 2014 to October 2014, and a leak test will be performed on the <br />facility from October 2014 to January 2015. <br />5.3.3 Public Use <br />It is not anticipated the public will use the Greeley 35th Avenue Mine property after reclamation. <br />The facility will be used as a water augmentation reservoir. <br />5.3.4 Reclamation Measures — Material Handling <br />Reclamation grading and backfilling will occur as necessary to comply with all local and state <br />erosion prevention measures. The slopes within the West Pit will be graded to a 3:1 (H:V) slope <br />above and below the post -mine normal high water line (NHWL). <br />There has been no refuse, acid - forming, or toxic producing material mined at the Greeley 35th <br />Avenue Mine, and none of this material is expected to be produced. <br />The Greeley 35th Avenue Mine is a surface mine with no adits or shafts that require closing. <br />Reclamation design does not include plans for agricultural or horticultural use. <br />Supplemental fines will be imported for use in the construction of the slurry wall as wall backfill. <br />