My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-20_REVISION - M1977036 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977036
>
2014-11-20_REVISION - M1977036 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:15 PM
Creation date
11/24/2014 7:58:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977036
IBM Index Class Name
Revision
Doc Date
11/20/2014
Doc Name
Responses to the Adequacy Review.
From
GEI
To
DRMS
Type & Sequence
AM2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Am9z <br />Z. <br />GE1Consultants <br />Geotechnical November 18, 2014 <br />Environmental <br />Water Resources rces GEI Project No. 1402970 RECEIVED <br />Ecological <br />*V 2 0 2014 <br />Peter Hays DIVISION OF RECLAMATION <br />Colorado Division of Mining, Reclamation, and Safety MININGANDD SAFETY <br />1313 Sherman St., Room 215 Oki G) f 0 L <br />Denver, CO 80203 <br />Re: MMM Greeley 35th Avenue Mine (M -)(977 -036) Construction Material <br />Regular (112) Operation Reclamation Permit Amendment Application <br />Dear Mr. Hays, <br />Included in this envelope you will find printed copies of the documents sent by <br />email on 11/7/2014, and are also responses to the adequacy review comments for <br />the Greeley 35 h Avenue Mine (M -1977 -036). 14_� <br />Comment 1— Proof of publication in a local newspaper <br />Comment 2— Proof of notice to surface and mineral rights owners of affected land <br />within 200ft <br />Comment 3— Response to comments from Tim Cazier regarding the groundwater <br />modeling <br />Comment 4 — Signatures added to Figures C -1 through C -4 and B -2 <br />Comment 5 — Draft removed from comment C -4 and B -2 <br />Comment 6 — Text revised on page 4, in Section 3.1 <br />Comment 7 and 8 — Text revised in Exhibit E — Reclamation plan <br />Comments 9 and 10 — Signatures added and "draft" label removed <br />Comments 11 -17 — Revised Exhibit G and GMMP <br />Comment 21 — Is included in Exhibit S <br />Comments NOT included 18 -20 <br />Comment 18 — Well agreements are in the mail and have been received by <br />recipients. As of 11/18, I haven't received the receipt confirmation card. <br />Comment 19 — Will be addressed by the DRMS after completion of adequacy <br />review comments <br />Comment 20 — Exhibit R <br />- Exhibit R will be completed after all adequacy review comments have been <br />addressed <br />-The Geostability exhibit is still being addressed <br />www.geiconsultants.com GEI Consultants, hic. <br />4601 DTC Boulevard, Suite 900, Denver, CO 80237 <br />303.662.0100 fax: 303.662.8757 <br />
The URL can be used to link to this page
Your browser does not support the video tag.