Laserfiche WebLink
Culvert F5 (Temporary) <br /> Flow In a 30" Half Culvert <br /> Culvert F-5 will be located at the transition point between the new East Diversion ditch elevation,and the <br /> existing East Diversion ditch elevation. Culvert F-5 will be temporary, used only during construction. <br /> TR-89 App B-68 08/14 <br />