Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Technical Revision No. 93 <br />Haul Route: <br />Page 6 of 7 <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />500.00 <br />0.00 <br />4.00 <br />4.00 <br />1 2665 <br />0.285 <br />Haul Time: 0.285 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( %) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( %) <br />( %) <br />(fpm) <br />Time <br />min <br />1 <br />500.00 <br />0.00 <br />4.00 <br />4.00 <br />2849 <br />0.201 <br />Loading Tool unit <br />Production 469.83 <br />Truck Unit Production <br />215.35 <br />Optimal No. of Trucks: 2 <br />Return Time: 0.201 <br />Total Truck Cycle Time: 2.559 <br />LCY /Hour Adjusted for job efficiency: <br />LCY /Hour Adjusted for job efficiency: <br />Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 357.49 <br />Adjusted single truck/loader team production: 357.49 <br />Adjusted multiple truck/loader team production: 357.49 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: $0.997 /LCY <br />minutes <br />minutes <br />389.96 LCY /Hour <br />178.74 LCY /Hour <br />2 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 139.87 Hours <br />Total job cost: $49,859 <br />CIRCES Cost Estimating Software <br />