My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-21_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-11-21_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:33 PM
Creation date
11/21/2014 1:22:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
11/21/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Cost Summary for Removal of Temporary Culverts <br />Permit Action: Minor Revision <br />Site: Bowie No. 2 Mine 166 Permit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: OOZ State <br />Date: 11/14/2014 County <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOZ <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />000 <br />378 <br />Credit for previous T -174 and T -175 estimate <br />NA <br />1 <br />1 <br />-8.00 <br />($547.20) <br />$1,343.92 <br />Remove Temporary Culverts <br />DEMOLISH <br />8.00 <br />SUBTOTALS: <br />0 <br />$797 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and/or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />$16.10 <br />$8.37 <br />$0.00 <br />$79.70 <br />$104.17 <br />$901.17 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = $36.05 <br />Reclamation management and /or administration: <br />3.13% <br />$28.21 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $168.42 <br />TOTAL BOND AMOUNT (direct + indirect) = $965.42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.