Laserfiche WebLink
CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; HVSCS layout and covering with DCF; and LVSCS and SLF sampling. <br />Ii) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Low Volume Solution Collection System fill sample LVSCS -91C (Control sample) <br />Soil Liner Fill samples SLF -163C and SLF -164C (Control samples from the Cameron site) <br />General Project Items <br />Meetings and Discussions: <br />Weekly Contractor Meeting November 12, 2014 (CC &V, AMEC, and Ames) <br />s Ames daily safety meetings <br />ECA daily safety meetings <br />Sumrn&q of Coneems None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, AMEC, and Ames. <br />Miscellaneous: <br />• Ames' crusher changed from low volume solution collection fill production to drain cover <br />fill production. <br />• An 80 -mil geomembrane roll inventory was performed at Ames' gate 2. <br />Deliveries: None. <br />Submitted <br />Review d by: I <br />Tim Bur iZ <br />Project Resi a --" <br />Phone: 719- 689 -2986 <br />Projects <br />Reviewed _� —, <br />Reviewed By: � <br />Reviewed By: , <br />Date: November 17, 2014 <br />Date: November 17. 2014 <br />Date: I/- / Y / y <br />2014- 11- 15 -MLE2 WEEKLY FINAL Page 4 of 7 <br />