My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-20_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-11-20_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:31 PM
Creation date
11/21/2014 7:15:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
11/20/2014
Doc Name
Weekly CQA Report: Week ending 11/15/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; HVSCS layout and covering with DCF; and LVSCS and SLF sampling. <br />Ii) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Low Volume Solution Collection System fill sample LVSCS -91C (Control sample) <br />Soil Liner Fill samples SLF -163C and SLF -164C (Control samples from the Cameron site) <br />General Project Items <br />Meetings and Discussions: <br />Weekly Contractor Meeting November 12, 2014 (CC &V, AMEC, and Ames) <br />s Ames daily safety meetings <br />ECA daily safety meetings <br />Sumrn&q of Coneems None. <br />CC &V: Daily updates, reporting, and scheduling are some of the tasks occurring between CC &V <br />Projects, AMEC, and Ames. <br />Miscellaneous: <br />• Ames' crusher changed from low volume solution collection fill production to drain cover <br />fill production. <br />• An 80 -mil geomembrane roll inventory was performed at Ames' gate 2. <br />Deliveries: None. <br />Submitted <br />Review d by: I <br />Tim Bur iZ <br />Project Resi a --" <br />Phone: 719- 689 -2986 <br />Projects <br />Reviewed _� —, <br />Reviewed By: � <br />Reviewed By: , <br />Date: November 17, 2014 <br />Date: November 17. 2014 <br />Date: I/- / Y / y <br />2014- 11- 15 -MLE2 WEEKLY FINAL Page 4 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.