M 1 4& <br />re ® <br />• Excess material graded to the toe of the Ball Mill slope northwest of the Load Out Bin <br />(LOB) (day shift) <br />Any oversized material encountered was reduced in size by a hammer hoe. <br />Material was transported from the Surge area to SGVLF haul road stations 71 +00 to 73 +00 <br />where it was placed and compacted as structural fill. <br />Structural fill was placed and compacted downslope of Bench D stations D6 +00 to D8 +00 and on <br />SGLVF haul road between stations 15 +00 to 20 +00 per project specifications. The material was <br />hauled to the area from a stockpile located at SGLVF haul road stations 52 +00 to 54 +00. <br />Slope grading occurred in the Phase 1 area at the following locations: <br />• Above Bench A stations A14 +00 to A18 +00. <br />• Above SGVLF haul road stations 48 +00 and 51 +00. <br />• Above SGVLF haul road stations 55 +00 and 59 +00. <br />• Down slope of Bench L stations 1-28 +00 and L36 +00. <br />Any excess material generated from slope grading activities was stockpiled for subsequent <br />removal and use as structural fill. <br />A Cat loader built berms to accommodate 793 haul trucks along the SGVLF haul road at stations <br />15 +00 to 20 +00, 54 +00 to 80 +00, and 85 +00 to 87 +00. <br />Cat dozers were re- contouring the SGVLF haul road at stations 15 +00 to 20 +00 and 54 +00 to <br />56 +00. <br />Material was hauled from various locations along the SGVLF haul road between stations 38 +00 <br />to 54 +00 and placed upslope of Bench A stations A20 +00 to A22 +00 to create a temporary <br />loading ramp between stations A20 +00 and SGVLF haul road station 15 +00. <br />Subgrade: <br />No new Phase 1 subgrade was accepted during this reporting period. Refer to the figure in the <br />MLE2 weekly report for November 8, 2014 for accepted subgrade in the Phase 1 area. <br />Soil Liner Fill (SLF): <br />SLF was hauled from the Cameron Clay Pit area and stockpiled below Bench F between stations <br />F0 +00 and F10 +00. <br />No new Phase 1 SLF was accepted during this reporting period. Refer to the figure in the MLE2 <br />weekly report for November 8, 2014 for accepted SLF in the Phase 1 area. <br />Cameron Site: SLF processing continued at the Cameron Site. <br />Underdrain System: <br />Primary Underdrain: Complete. <br />Secondary Underdrain: No work was performed during this reporting period. <br />Tertiary Underdrain: No work was performed during this reporting period. <br />Leak Detection: <br />Approximately 160 lineal feet of leak detection trench was completed per project specification and <br />covered with soil liner fill downslope of Bench F station FF6 +50 to FF8 +00. <br />2014 -11 -15 -MLE2 WEEKLY FINAL Page 2 of 7 <br />