Laserfiche WebLink
0 <br />Mr. Robert Zuber <br />November 14, 2014 <br />Page 2 <br />Issue 4: Another observation regarding the text of'Exhibit 7 -14L Some useful information <br />regarding the hydrology for East Taylor Ditch was omitted, including channel length, slope, and <br />drainage area. The Division recommends that this information be retained in the narrative. <br />Response: Colowyo has updated the text on page 7- 14I -11 to refer back to page 7 -14I -2 for a <br />full description of the hydrologic information associated with the East Taylor Ditch including <br />channel length, slope, and drainage area. <br />Included with this adequacy response package are the revised materials and a change of <br />index sheet to ease incorporation into the permit document. If you should have any additional <br />questions or concerns, please feel free to contact Chris Gilbreath at (303) 254 -3291. <br />BAW:TT:pvt <br />Enclosure <br />cc: Dan Casiraro (via email) <br />Juan Garcia (via email) <br />Chris Gilbreath (via email) <br />Tony Tennyson (via email) <br />File: Colowyo CF 1.1.2.93 <br />G471- 11.3(21)b <br />AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER <br />A Touchstone Energy'Cooperative <br />rq <br />Sincerely, <br />f <br />F <br />Barbara A. Walz 4 <br />Senior Vice President <br />Policy and Compliance/ <br />Chief Compliance Officer <br />