Laserfiche WebLink
Albert Frei & Sons, Inc. <br />Hatchery Pit <br />Page 4 <br />Permit # M- 2014 -043 <br />• A pipe is not feasible on the Phase 1 area since the ground- <br />water elevation matches the Bull Seep and the gradient is <br />such that a positive drain could not be achieved. If needed <br />a ditch will be constructed along the up gradient sides of <br />the slurry wall and extend to Bull Seep to relieve any <br />mounding if it occurs. <br />• As applicable to the Phase 2 area a pipe drain could be <br />placed at an elevation near the top and parallel to the <br />slurry wall and would then be backfilled over. This would <br />keep the groundwater well below surrounding properties but <br />still provide for an outlet should it be needed. Determin- <br />ing the need for a drain in Phase 2 can be done once the <br />slurry wall is installed and dewatering begins. <br />Down Gradient Mitigation <br />• Well improvements. Affected water wells could be deepened or <br />modified to increase yield. Alternatively, new alluvial <br />wells could be constructed to provide a new water supply. <br />• Frei would provide temporary replacement, if needed, while <br />studies to determine fault are being conducted, or while <br />mitigation measures are in the process of being implemented. <br />The exact mitigation measure or combination of measures would be <br />determined based on additional investigations and consultations <br />with the affected party. Costs for implementation and maintenance <br />of mitigation measures needed resulting from Frei operations <br />would be borne by Frei. <br />Data Collection and Submittal to the Division <br />wells that will be installed around the perimeter of the <br />operation will have data collected on a monthly basis for the <br />first year and then quarterly there after. The data from these <br />piezometers will be use to monitor for compliance to stay within <br />baseline ranges, as changes at these wells could affect neigh- <br />bors. <br />The operator will give the Division a groundwater monitoring <br />well data summary report that includes, groundwater level data, <br />times the trigger points were exceeded, investigations into <br />cause, and any needed mitigation analysis /plans, with the annual <br />report. The operator will also contact the Division with this <br />information when /if a trigger point is reached and there seems to <br />be a trend. <br />4 <br />