My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-14_PERMIT FILE - M2014043 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014043
>
2014-11-14_PERMIT FILE - M2014043 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:23 PM
Creation date
11/19/2014 10:13:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014043
IBM Index Class Name
Permit File
Doc Date
11/14/2014
Doc Name
Adequacy Review 01
From
Environment, Inc.
To
DRMS
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Albert Frei & Sons, Inc. Page 2 <br />Hatchery Pit Permit # M- 2014 -043 <br />features have an impact on the current groundwater conditions and <br />the flow of it across, around and thru the permit area. <br />The location of the Bull Seep and Thornton's slurry wall will <br />limit the amount of ground water shadowing along the west side of <br />the mine. The Bill Seep will recharge the groundwater and the <br />mounding behind the slurry wall on the Thornton site will keep <br />the groundwater elevations constant on this site. <br />The backfilling along the entire north side may have already <br />limited water flow thru this area and is forcing the water to <br />backup on this site. That may be why there is a constant flow of <br />water thru the lateral drain that runs along the north side and <br />along the base of the hill. This may also explain why the water <br />elevation of the old gravel mine lake appears to be higher. On <br />the other hand if it has restricted flow thru that site it has <br />not has a significant impact to the east. <br />Most of the existing lateral ditches and small ponds will be <br />removed as mining progresses. They now serve to direct the <br />seepage water and surface waters around the property and back to <br />the western drainage. The existing ditches will be rerouted to <br />more direct routes and new ones will be installed around the <br />mined areas to preserve the historic flow of the water. On the <br />north they will be directed into the existing lake so the water <br />returns to the system. On the south a lateral ditch will be <br />built along the south side of the slurry wall so water can be <br />diverted back to the Bull Seep drainage. This ditch will also <br />act as a surface drain for groundwater that may backup along the <br />slurry wall in that area. <br />Groundwater Monitoring Data Analysis <br />As the data is collected, it will be recorded in a spread sheet <br />and graphed to establish the baseline data that can be used to <br />determine what if any impacts the slurry walls are having on the <br />groundwater table. Once the 1 year of data is collected, we can <br />determine what the trigger point elevations are to determine what <br />actions are needed. Data collection will continue on a quarterly <br />basis until the site is reclaimed. <br />Baselines and Trigger Points <br />The baselines for each well will be determined by taking the high <br />and low elevations of each well from the data collected the first <br />year. The proposed trigger points will be determined to be <br />elevations that are greater than two (2) foot above the highest <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.