My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-10_PERMIT FILE - C1996083 (4)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083
>
2014-10-10_PERMIT FILE - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:46 PM
Creation date
11/18/2014 12:45:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Permit File
Doc Date
10/10/2014
Section_Exhibit Name
Volume III Exhibit 02 Water Augmentation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Application of Bowie Resources, LLC <br />Case No. 02CW77 <br />Ruling of Referee and Decree <br />Page 17 <br />28. The application for conditional rights of exchange set forth in the Second Claim <br />for Relief of the Application filed herein is hereby approved, as follows: <br />A. A conditional right of exchange associated with the use of Blue Mesa <br />Reservoir contract water, as set forth in the plan for augmentation described above, is hereby <br />awazded to Applicant. The exchange shall be known as the "Bowie-Blue Mesa Exchange." The <br />downstream terminus of the exchange is the confluence of the North Fork of the Gunnison River <br />with the Gunnison River. The upstream terminus of the exchange is the headgate of the Deer <br />Trail Ditch. The appropriation date of the exchange is December 31, 2004. The amount of the <br />exchange is 0.52 c.f.s. <br />B. A conditional right of exchange associated with the use of East Beckwith <br />Reservoir No. 1 water, as set forth in the plan for augmentation described above, is hereby <br />awarded to Applicant. The exchange shall be known as the "Bowie-East Beckwith Exchange." <br />The downstream terminus. of the exchange is the confluence of Hubbard Creek with the North <br />Fork of the Gunnison River. The upstream terminus of the exchange is the headgate of the Deer <br />Trail Ditch. The appropriation date of the exchange is May 31, 2002. The amount of the <br />exchange is 0.50 c.f.s. <br />29. The priority dates awarded to the water rights decreed herein are as follows: <br />Water Rieht Priority Date <br />Bowie Sedimentation Pond W-1 April 30, 2002 <br />Bowie Sedimentation Pond W-2 April 30, 2002 <br />Bowie Timber Storage Sedimentation Pond April 1, 1978 <br />Bowie Refuse Pile Sedimentation Pond July 1, 1983 <br />Bowie Sedimentation Pond 1 September 1, 1978 <br />Bowie Sedimentation Pond 2 September 1, 1978 <br />Bowie Sedimentation Pond 3 September 1, 1978 <br />Bowie Sedimentation Pond 4 September 1, 1978 <br />Bowie Stockpile Sedimentation Pond April 30, 1979 <br />Bowie Loadout Sedimentation Pond April 30, 1979 <br />Bowie Sedimentation Pond J April 30, 2002 <br />Bowie Sedimentation Pond K April 30, 2002 <br />Bowie Sedimentation Pond F April 30, 2002 <br />The original Application was filed herein in 2002, and the water rights awarded herein shall be <br />administered as having been awarded on an application filed in such year. <br />
The URL can be used to link to this page
Your browser does not support the video tag.