My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-10_PERMIT FILE - C1996083A (24)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-10-10_PERMIT FILE - C1996083A (24)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:48:47 PM
Creation date
11/18/2014 12:38:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
10/10/2014
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recorder with satellite telemetry. A full suite sample from List 1 will be obtained <br />semi - annually during the second and fourth quarters. During August of each year a <br />sample will be obtained and analyzed for the parameters on List 2. <br />Stephens Draw will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9. Field parameters will be <br />measured each quarter. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Gulches A, B, C, & D will be monitored quarterly at the designated upstream and <br />downstream monitoring locations shown on Map 9 except A -Gulch does not have an <br />upstream monitoring point. Field parameters will be measured each quarter. A full <br />suite sample from List 1 will be obtained semi - annually during the second and fourth <br />quarters. <br />West Terror Creek (SW -1 and SW -12) will be monitored quarterly for field <br />parameters. A full suite sample from List 1 will be obtained semi - annually during the <br />second and fourth quarters. Flows in the West Fork of Terror Creek, collected at <br />flume monitoring stations SW -1 and SW-12, will be available in real time, updated <br />hourly. Real time data will not be available during high flow, freezing conditions or <br />when real time data equipment is inoperable. In the absence of real time data, flow <br />will be measured monthly, increasing to weekly when the West Fork of Terror Creek <br />lies within the predicted angle of draw. Weekly flow measurements will be initiated <br />three months prior and continue for six months following longwall extraction under <br />the West Fork of Terror Creek. Field parameters will be collected monthly during <br />this nine month period. There will likely be periods of time during the winter months <br />when the flumes are inaccessible. <br />Ephemeral channels EPH -1 through EPH -9 are located in the Spruce Stomp <br />expansion area and are shown on Map 9. The Operator will endeavor to sample <br />water from each ephemeral channel for complete chemical analysis and field <br />parameters twice a year; once during snowmelt, and once during a storm event. <br />Upstream and Downstream Stevens Gulch (SW -11 & SW -5) will be monitored <br />quarterly for field parameters. A full suite sample from List 1 will be obtained semi- <br />annually during the second and fourth quarters. <br />Terror Creek D32-4, SW -2, D21 -1 will be monitored quarterly for field parameters. A <br />full suite sample from List 1 will be obtained semi - annually during the second and <br />fourth quarters. <br />Terror Ditch SW -10 will be monitored quarterly for field parameters. A full suite <br />sample from List 1 will be obtained semi - annually during the second and fourth <br />quarters. <br />PR -14 2.05-126 10/03/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.