My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-13_PERMIT FILE - M2014042
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014042
>
2014-11-13_PERMIT FILE - M2014042
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:21 PM
Creation date
11/18/2014 7:06:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014042
IBM Index Class Name
Permit File
Doc Date
11/13/2014
Doc Name
FW Estimate
From
DRMS
To
Mr. Russell Painter
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHEEL LOADER — LOAD AND CARRY WORK <br />Task description: Backrill Hole (201x601) <br />Site: Amazonite #VIII Permit Action: PAR <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 9/9/2014 County: Teller <br />User: TC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 246C <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job #: M2014042 <br />Abbreviation: None <br />Filename: M042 -001 <br />Horsepower: 73 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL OUANTITIES <br />Initial volume: 356 CCY Swell factor: 1.330 <br />Loose volume: 473 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.425 minutes <br />C cle Time Factors <br />Length <br />Factor min. <br />Utilization % <br />Ownership Cost/Hour: <br />$6.84 <br />0.020 <br />NA <br />Operating Cost/Hour: <br />$18.66 <br />- 0.000 <br />100 <br />Operator Cost/Hour: <br />$37.13 <br />0.000 <br />NA <br />Total Unit Cost/Hour: <br />$62.64 <br />-0.040 <br />Total Fleet Cost/Hour: <br />$62.64 <br />I No adjustment - factor not applicable 0.00 <br />MATERIAL OUANTITIES <br />Initial volume: 356 CCY Swell factor: 1.330 <br />Loose volume: 473 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Loader Cycle Time: Unadjusted Basic Cycle Time (load, dump, maneuver): <br />0.425 minutes <br />C cle Time Factors <br />Length <br />Factor min. <br />Source <br />Material: <br />Mixed material 0.02 <br />0.020 <br />Cat HB <br />Stockpile: <br />No adjustment - factor not applicable 0.00 <br />- 0.000 <br />Cat HB) <br />Truck Ownership: <br />No adjustment - factor not applicable 0.00 <br />0.000 <br />(Cat HB) <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />(Cat HB) <br />Dump Target: <br />I No adjustment - factor not applicable 0.00 <br />0.000 <br />Cat HB <br />Net Cycle Time Adjustment: <br />Adjusted Basic Cycle Time: <br />-0.020 <br />0.405 <br />Rolling Resistance — Road Conditions <br />Haul: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Return: Rutted dirt, little maintenance, no water, 1" tire penetration 4.0 <br />Haul and Return Time <br />minutes <br />minutes <br />CIRCES Cost Estimating Software <br />Length <br />Grade Res. <br />I Rolling <br />Total Res. <br />Travel Time <br />(feet) <br />% <br />I Res. %) <br />I (% <br />(minutes) <br />Source <br />Haul Route: <br />10 <br />5.00 <br />4.00 <br />9.00 <br />0.0109 <br />Cat HB <br />Return Route: <br />10 <br />-5.00 <br />4.00 <br />-1.00 <br />0.0042 <br />Cat HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.