Laserfiche WebLink
November 5, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 10 of 14 <br />Reclaimed lower three <br />benches of Gob Pile 94 <br />(covered with erosion <br />control mat) <br />rx <br />Cover material <br />excavation at Gob Pile 93 <br />r �' }.at T.. :�•" T I.� i _r -'•fir 'i <br />4. <br />/y <br />✓l'yly�t,�,i <br />Regrading upper bench of <br />Gob Pile #4 <br />Reclaimed Gob Pile #4 <br />bench (covered with <br />erosion control mat) <br />Outslope of West <br />_ <br />Diversion ditch <br />Number of Partial Inspection this Fiscal Year: 5 <br />Number of Complete Inspections this Fiscal Year: 2 <br />Page 10 of 14 <br />