My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-17_PERMIT FILE - C1981035A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981035
>
2014-10-17_PERMIT FILE - C1981035A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2016 8:55:18 AM
Creation date
11/13/2014 10:16:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981035A
IBM Index Class Name
Permit File
Doc Date
10/17/2014
Doc Name
Licenses and Permits
Section_Exhibit Name
KII Appendix 02 Licenses and Permits
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
supply amount is available at the HGD headgate, or a lesser amount based on the lesser <br />proportion of water available at the headgate as described in Section 6.8.4. Applicant will <br />release its return flow obligation to the stream on a weekly basis. <br />6.8.7. D13-U : Huntington will dry-up 12 acres. At the conclusion of <br />Applicant's lease with Huntington, irrigation from the HGD may be resumed for the 12 Acres. <br />The 12 Acres shall be revegetated consistent with C.R.S. 37 -92- 305(4.5). <br />6.8.8 Dominion and Control GCC intends to retain dominion and control over <br />all fully consumable water attributable to the change of water right described herein. GCC's <br />primary use of the water right changed herein (i.e., dust control) is fully consumable. However, <br />to the extent that the Leased Shares are applied to less than fully consumptive uses, such as to <br />supply GCC's domestic water needs, GCC will account for and will use the fully consumable <br />return flows from said uses by diverting additional water from the Hay Gulch Ditch equal to the <br />amount of fully consumable water released to the stream. If the wastewater leach field or <br />discharge point for return flows is within 100 feet of Hay Gulch, return flows will be deemed to <br />be instantaneous, and GCC can divert additional water equal to the return flows from Leased <br />Shares without lagging such diversions. if, however, the leach field or discharge point is farther <br />than 100 feet from Hay Gulch, GCC will perform a lag depletion analysis approved by Objector <br />and DWR prior to diverting additional water from Hay Gulch Ditch equal to the amount of return <br />flows from GCC's Leased Shares. <br />7. Conditional Ground Water Right - GCC Well Field. <br />7.1. Location and Description: The GCC Well Field will be comprised of up to three <br />ground water wells located within the SW' /. of Section 36, T35N, R12W, NMPM. The actual <br />location of the GCC Well Field, with distances from section lines, will be provided when GCC <br />files an application to make the GCC Well Field water right absolute. The GCC Well Field will <br />collectively operate as one water right. <br />7.2. Source: Ground water tributary to Hay Gulch, tributary to the La Plata River, <br />7.3. Amount: 30 gallons per minute, conditional. This amount is the combined total rate <br />of flow requested for all of the wells operating under this conditional water right. <br />7.4. Uses: Industrial, commercial, domestic, and augmentation under paragraph 9 herein, <br />including the right to store water as set forth in paragraph 8 herein for subsequent use for the <br />above - identified uses. <br />7.5. Appropriation Date: December 31, 2007. <br />7.6. The GCC Well Field may operate out of priority when Applicant replaces the out -of- <br />priority depletions resulting therefrom in accordance with the Plan for Augmentation set forth in <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.