Laserfiche WebLink
MAPS <br />TITLE <br />DATE(S) <br />DATE (S) <br />3 -1 Surface/Mineral Ownership <br />2 Temporary Haul & Access Roads Plan & Profile (4 sheets ) <br />8/97,5/92 <br />4 -1 Land Use Ma <br />5/92 <br />4 -2 Geologic Ma <br />9/82,5/92 <br />4 -3 Hydrology or Well & Spring Locations <br />10/82,1/83 <br />4-4 Animas River Hydrology Stations <br />5/92 <br />4 -5 Soils Ma <br />5/92 <br />4 -6 Vegetation Communities & Reference Area <br />5/92 <br />4 -7 Wildlife Resources Information <br />5 -1 Sediment Control <br />6/92,8/93 <br />5 -2 Mine Plan Ma <br />6/92 <br />5 -3 Soil Stripping & Res readin <br />6/92 <br />5-4 Final Reclaimed Topography <br />+ Cross Sections (Worst Case Final Topography) <br />3/93 <br />5 -5 Reve etation Ma <br />6/92 <br />5 -6 Maximum Disturbance <br />2/93 <br />5 -7 Current Disturbance as of 1/92 <br />5/92 <br />5 -9 Drainage Ana sis of Site Conditions <br />Appendix <br />5 -9/10 <br />5 -9A E. Collection Channel Upper Section <br />Appendix <br />5 -9/10 <br />5 -9B E. Collection Channel Lower Section <br />Appendix <br />5 -9/10 <br />5 -10 Surface Water Control Map <br />Appendix <br />5 -9/10 <br />Partial Boundary Survey (Goff) <br />3/94 <br />Mine Hydrology Ma (Lewicki) <br />8/02 <br />101 -D Permit Boundaries (Savage & Savage) <br />4/05 <br />Mine Plan Ma Lewicki <br />8/02 <br />Post Mining To h (Lewicki) <br />8/02 <br />Site Cross Sections (Lewicki) <br />6/02 <br />Post Mining Topography (TR13) (Savage & Savage) <br />7/06 <br />Equipment Area Post Mining Too h (Savage & Savage <br />3/06 <br />Pueblo Coal Typical Haulroad X.S. Cert. <br />EXHIBITS <br />TITLE <br />DATE(S) <br />1 Temporary Haul & Access Roads <br />5/84 <br />2 Temporary Haul & Access Roads Plan & Profile (4 sheets ) <br />5/84 <br />