My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-04_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2014-11-04_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:14 PM
Creation date
11/10/2014 8:14:15 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Revision
Doc Date
11/4/2014
Doc Name
Cost Estimate
From
DRMS
To
New Elk Coal
Type & Sequence
TR68
Email Name
LDS
MPB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Haul Raw Coal Stockpile to Development Waste Pile <br />Site: New Elk Mine Permit Action: Permit Renewal 06 Permit/Job #: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 608 State: Colorado <br />Date: 5/12/2014 County: Las Animas <br />User: JRS <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: Cat 627G <br />- Dozer: Cat D9T - 9SU <br />Abbreviation: None <br />Filename: C012 -608 <br />COSTShift basis: 1 per day <br />iption <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Eauipment Maintenance Eauinment <br />Total work team cost/hour: $934.77 <br />MATERIAL OUANTITIES <br />Initial volume: 5,900 CCY Swell factor: 1.185 <br />Loose volume: 6,992 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs /LCY <br />Material description: Coal - Bituminous, Raw <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 33.00 LCY <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />45 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost /hour: <br />$69.99 <br />$81.10 <br />NA <br />NA <br />$42.03 <br />$20.53 <br />Operating cost/hour: <br />$184.31 <br />$64.42 <br />NA <br />NA <br />$34.94 <br />$23.89 <br />Ripper op. cost/hour: <br />NA <br />$1.78 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$33.56 <br />$38.01 <br />NA <br />NA <br />$24.47 <br />$27.88 <br />Unit Subtotals: <br />$287.87 <br />$18530 <br />NA <br />NA <br />$101.43 <br />$7230 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$761.04 <br />Support: <br />$0.00 <br />Maint: <br />$173.73 <br />Total work team cost/hour: $934.77 <br />MATERIAL OUANTITIES <br />Initial volume: 5,900 CCY Swell factor: 1.185 <br />Loose volume: 6,992 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs /LCY <br />Material description: Coal - Bituminous, Raw <br />Rated Payload: 52,800 pounds <br />Payload Capacity: 33.00 LCY <br />Scraper Bowl (volume) Basis <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.