Laserfiche WebLink
I <br />INIQLas: <br />-A <br />djeicen� Land, Ovy n,-,- <br />1) Al final slopes shall be 3:1 or alat�er. <br />2) The erosion berm will expand to final location as shown on this map -i's the <br />mine expands outward. <br />3) Vertical walls will expand as mining expands until it entrudes on the final <br />3:1 or flatter slopes. At this point the vertical wall will be shot to meet <br />the final slopes. 1,900 L.F. <br />4)YeTbc,-nl high wall will not exceed 1,500 L.F.@ 40'bleght far the duration Adjacent Land Ow ner <br />of the mining. Ray &s <br />-2 <br />5) All contours are at I ft intervals. 0, :aa® <br />6) Phase B mining and Phase 0 reclamation will be submitted upon complefign of <br />Phase A. <br />1 %0, W 1%71 , <br />P)c 14 0.7 <br />Ac--�;qz Road) <br />T opzQWErodon Control Bcarm <br />Erosion E;ern, TV <br />NR � 11111,:-; <br />" Dlrectlox-1 <br />F-r, RECEIVED <br />cent- Land Owner <br />Sikes NnIl 0 4 2014 <br />1NA%*N@F!TqLSMAwM T" <br />MNW#M <br />- J- <br />r-U-M <br />Couniy "I a' <br />i <br />Maped By James Higgs <br />