My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-11-03_PERMIT FILE - M2014055
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014055
>
2014-11-03_PERMIT FILE - M2014055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:12 PM
Creation date
11/4/2014 10:48:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014055
IBM Index Class Name
PERMIT FILE
Doc Date
11/3/2014
Doc Name
Updates to application package
From
ACA Products
To
DRMS
Email Name
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 9, 2014 <br />Michael Coleman <br />'pll <br />OCR <br />24 <br />2014 <br />BY- -------------- ------ <br />id %�JJ? / -/ <br />COLORADO <br />Division of Reclamation, <br />M Mining and Safety <br />ACA Products, Inc. I Department of Natural Resources <br />702 Gregg Drive 1313 Sherman Street, Room 215 <br />Buena Vista, CO 81211 Denver. CO 80203 <br />RE: ACA 301 Pit, File No. M- 2014 -055, Receipt of Incomplete Construction Material Regular <br />(112) Operation Reclamation Permit Application Package <br />Dear Mr. Coleman: <br />On October 1, 2014, the Division of Reclamation, Mining and Safety (Division) received the <br />Construction Material Regular (112) Operation Reclamation Permit Application package for the <br />ACA 301 Pit, File No. M- 2014 -055. A preliminary review of the information received determined <br />that the following information /items must be received before the Division can consider the <br />application submitted and technical review can begin: <br />APPLICATION PACKAGE: <br />Per Rule <br />6.4.3 ,/ EXHIBIT C - Pre - mining and Mining Plan Map(s) of Affected Lands <br />Please list all adjoining surface owners of record <br />6.4.5 EXHIBIT E - Reclamation Plan <br />(2) (c) Provide a description of how the Reclamation Plan will be implemented <br />to meet each applicable requirement of Section 3.1; <br />(e) Provide a plan or schedule indicating how and when reclamation will be <br />implemented. Such plan or schedule shall not be tied to any specific date <br />but shall be tied to implementation or completion of different stages of <br />the mining operation as described in Subparagraph 6.4.4(e). The plan or <br />schedule shall include: <br />(i) An estimate of the periods of time which will be required for the various <br />stages or phases of reclamation; <br />(ii) A description of the size and location of each area to be reclaimed during <br />each phase; and <br />(iii) An outline of the sequence in which each stage or phase of reclamation <br />will be carried out. <br />p@ COO\ <br />S4 A- <br />1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http: / /mining. state, co. us �� '' ^1 0 <br />John W Hicken.looper, Governor I Mike King, Executive Director I Vir;inia Brannon, Director �• *�,n,b; �* <br />
The URL can be used to link to this page
Your browser does not support the video tag.