Laserfiche WebLink
Table 6 <br />Total Augmentation Requirements for the Larimer Pits, Mariana Butte Pit & Baer Pit <br />Temporary Augmentation Replacement for November 2014 through October 2015 <br />Month <br />(1) <br />Lorimer Pits <br />Logged Net Evap <br />Augs Requirement <br />(Acre -feet) <br />(2) <br />Mariana Butte Pit <br />Lagged Net Evap. <br />Aug. Requirement <br />(Ac6.Feet) <br />(3) <br />Baer Pit <br />Logged Net Evap. <br />Aug. Requirement <br />Acre -Feet) <br />(4) <br />Total Projected <br />Lagged Production <br />Depletions. <br />(Acre -Fect) <br />(S) <br />Total <br />Mining <br />Depletions <br />(Acre -Feet) <br />(6) <br />Barnes Ditch <br />Return Flow <br />Requirements <br />(Acre -Feet) <br />(7) <br />Tatal <br />Augmentation <br />Requirements <br />(Acre -Feet) <br />(8) <br />Stream <br />Deplenon <br />Credits <br />(Acre -Feet) <br />(9) <br />City of Loveland <br />Reusable <br />Effluent <br />(Acre -Feet) <br />(10) <br />Bames Ditch <br />Replacements <br />(Acre -Feet) <br />(11) <br />Total <br />Augmentation <br />Replacements <br />(Acne -F&I) <br />Nov -14 <br />4.05 <br />0.47 <br />212 <br />112 <br />7.75 <br />4.4 <br />12.15 <br />12.15 <br />12.IS <br />Dec -14 <br />3.12 <br />032 <br />151 <br />090 <br />5.85 <br />15 <br />7.35 <br />735 <br />7.35 <br />JanA 5 <br />290 <br />0.24 <br />126 <br />070 <br />5,09 <br />0.5 <br />5.59 <br />5.59 <br />5.59 <br />Feb-15 <br />3.21 <br />0.20 <br />126 <br />0.66 <br />5.34 <br />0.2 <br />5.54 <br />554 <br />5.54 <br />Mar -15 <br />390 <br />0.25 <br />1.52 <br />0.65 <br />6.32 <br />01 <br />6.42 <br />6.42 <br />6.42 <br />Apr -15 <br />6.14 <br />0.32 <br />2,26 <br />079 <br />9.51 <br />9.51 <br />9.51 <br />9.51 <br />May-15 <br />7.34 <br />0.46 <br />2.93 <br />0.97 <br />1171 <br />1 1.71 <br />58.77 <br />1171 <br />11.71 <br />Jun-15 <br />11.38 <br />0.61 <br />442 <br />100 <br />17.41 <br />17.41 <br />68.24 <br />17.41 <br />17.41 <br />Jul-15 <br />1321 <br />0.87 <br />567 <br />101 <br />20:76 <br />20.76 <br />69.29 <br />20.76 <br />20.76 <br />Aug. 15 <br />12.20 <br />0.95 <br />561 <br />102 <br />1979 <br />19.78 <br />3920 <br />19.78 <br />19.78 <br />Sep. 15 <br />918 <br />0.84 <br />449 <br />099 <br />15,50 <br />15.50 <br />1010 <br />540 <br />10.10 <br />15.50 <br />Oct -15 <br />666 <br />0.69 <br />.1.39 <br />0.94 <br />1 i.G7 <br />1 1.67 <br />4 59 <br />7.08 <br />4,59 <br />I1.67 <br />Total <br />83 030 <br />6 22 <br />36,44 <br />10.75 <br />136,70 <br />6.70 <br />143.40 <br />250 18 <br />59.05 <br />84 35 <br />143.40 <br />Notes: (1) From Table 2. <br />(2) From Table 3 <br />(3) From Table 4. <br />(4) From Table 5, <br />(5) (1)+(2) +(3) +(4). <br />(6) From Table 7. <br />(7) (5)+(6), <br />(8) From Table 7. <br />(9) City of Loveland Reusable Effluent is available on demand and up to 99 acre -feet. <br />(10) Minimum of (7) and (8). <br />(19) (9) + (10), should be equal to (7). <br />4 <br />Bppw <br />BA if MAI• Lndrl P'* Mwel t. M SWMV14 SW PLW wd MwdA . 6w wJ 8r Fw"14 SWSPA.*i..* TYL6 <br />. runlunl• fl/7llllr flMnl. IlrN A /Nl. Id71MI4 1151 AM 6L <br />