My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-30_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-10-30_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:55:09 PM
Creation date
11/3/2014 9:51:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/30/2014
Doc Name
Weekly CQA Report: Week ending 10/18/14.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L"M, <br />Wil <br />Phase 1 80 -mil DSMS LLDPE Liner Installation <br />No new liner was deployed this week. <br />D) Drain Cover Fill (DCF) <br />Ames crusher operations continued drain cover fill production <br />Cat 740 trucks hauled drain cover fill to the PSSA. Haul roads for the Cat 740s were maintained <br />at least 4 feet above the secondary geomembrane and HVSCS piping. <br />Drain cover fill was placed on accepted primary liner in minimum 2 -foot lifts in the PSSA on <br />panels P116 to P123; P154 to P156; P288 to P294; P331 to P353; 355 to P370; P372; P385 to <br />P396; P398 to P405; and P403 to P426. <br />Drain cover fill was placed around the HVSCF risers and manifold with a Cat 330 track hoe after <br />the Primary geomembrane was approved for DCF placement on the PSSA sump area. <br />See the attached DCF map for all placement <br />E) High Volume Solution Collection System Piping (HVSCS): <br />Four, 12, and 24 -inch ADS HVSCS piping was laid out on the on the PSSA inboard slopes. <br />Fusion welding occurred on the HVSCS HDPE 28 -inch piping in the PSSA floor. <br />The HVSCS vertical riser bases were cleaned and realigned to plan position. <br />All four sections of HVSCS vertical louvered screen and compression sections on the vertical <br />riser base plate were installed in the PSSA sump as well as a section of 28 -inch HDPE pipe from <br />the manifold on the PSSA floor. <br />II) Storm Water Management <br />Best Management Practices (BMPs) are being performed. <br />CQA ACTIVITIES: <br />1) Field Activities: Field activities and observation during this reporting period included: Slope grading <br />and fill placement; nuclear density and moisture testing; HVSCS pipe cleaning; HVSCS HDPE piping <br />fusion; HVSCS vertical louvered and compression section installation; ADS HVSCS piping layout-, <br />and DCF sampling. <br />II) Laboratory Activities: Permeability, Atterberg limits, moisture, and sieve analysis laboratory testing <br />continued. <br />The following samples were collected and returned to AMEC's laboratory for analysis: <br />Drain Cover Fill sample DCF 114 (Control sample) <br />Drain Cover Fill sample DCF 12 -R (Record sample) <br />Structural Fill sample SF 98 -R (Record sample) <br />Soil Liner Fill sample SLF -156C (Control sample from the Cameron Site) <br />2014 10 18 -MLE2 WEEKLY FINAL Page 3 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.